Request a quoteRequest a quote

Ports and marine translation, in your terms.

Marine engineering translation for wharves, breakwaters, ferry terminals and harbours, with every drawing, specification and study in the terms the owner approved.

01 / The problem

Where marine packages drift

Owners of ports and maritime structures publish in both languages. French that reads well can still use a word the owner retired years ago.

A

The owner already has the words

A breakwater is a brise-lames en enrochements, armour stone is roche de la carapace and a fender is a défense d'accostage. Federal marine owners hold bilingual specifications going back decades, and their reviewers know them.

B

One wharf, many authors

A single marine package can combine coastal and port engineering, geotechnical borehole logs, a dredging plan, a fish habitat assessment and cathodic protection. Each author writes in their own words about the same structure.

C

Bidders price what they read

Marine contractors price a tender in a short window, against the work restrictions in the specification. They won't call to ask what you meant if the answer looks obvious.

The reader of the tender

A contractor who reads the wrong depth prices the wrong volume.

02 / Project: a working ferry terminal

A tender at a working terminal, and 118 questions before it went out.

For a federal department, we translated the tender package for a new potable water system at an active ferry terminal in Canada, from English to French.

The contract covers a new treatment building, a new well and the decommissioning of the old supply. The tender expects everything outside the immediate construction area to remain operational, and access to the jetty to be maintained at all times.

Questions logged118

Translator questions sent to the engineer or client across eight query logs.

Words121k

121,945 words, English to French.

Source documents101

Specification files, 99 of them numbered sections.

AutoCAD drawings25

Drawings billed and translated with the specification.

What the French had to keep apart

Some words needed the client's answer first.

From the query log
In the sourceThe answer
surge stonearmour stone, pierre de carapace
scorn nutcap nut, écrou borgne
American Society of Mechanical Departmental RepresentativesEngineers

The client's "surge stone" turned out to mean armour stone, which the French gives as pierre de carapace. A tie-in is a piquage, and the drawing and the section had to say so.

Control tags change with the language too. A PLC is a CP and a VFD a VF in the French tags, so every place that names the device has to use the same French letters.

Query log / Source text

The source had its own errors

A global replace produced "American Society of Mechanical Departmental Representatives". The translator asked, and the answer was to use Engineers. The same log caught "scorn nut" for a valve part, which the client confirmed meant a cap nut, écrou borgne in French.

Query log / Controls

Questions only an engineer could answer

"De-bounced" inputs, a "ramp rate algorithm" and a "swab launcher" all went back to the engineer. "AND" on a logic gate note turned out to be the word, not an acronym, and on the P&IDs the answer was to leave tag letters alone and translate only the descriptions.

References / Provincial

Some titles have no French

The client confirmed that a provincial traffic control manual has no French version, and an erosion handbook is in English only. Those titles were translated directly so a French reader could still understand what was being cited.

Work restrictions

The tender sets the rules for a site that stays in service.

These are the restrictions a bidder prices. Each one has to read exactly the same in French, from the general requirements to the section that applies it.

Regular work hours07 to 17

Regular and noise-generating work, Monday to Friday. Other hours are coordinated with the Departmental Representative.

Service interruptions48 h

Notice before any mechanical or electrical service interruption.

Jetty accessAlways

Access to the jetty maintained at all times during construction.

Why it matters

A bidder won't call to ask.

That is why the questions get asked before the tender goes out, by the translator, and why each answer has to hold in every document that follows. The register shows what that means for each kind.

03 / Document register

What each document needs

A marine contractor reads the wharf drawings, the dredging specification and the environmental protection plan side by side.

  1. MR-01

    Wharf and breakwater drawings

    Sections through a wharf carry elevations to chart datum, layer callouts and pile schedules in very little space. The same element appears on the plan, the section and the specification, so its name has to match on all three.

  2. MR-02

    National Master Specification (NMS) sections

    Marine packages draw on Division 35 and the pile and riprap sections of Division 31. Standard NMS text comes back in the official French, and the project text uses the same terms. See our national master specification translation.

  3. MR-03

    Dredging specifications

    Dredge areas, grade depths, disposal sites and monitoring are priced item by item. Zéro des cartes and profondeur à draguer have to read exactly the same in every section that uses them.

  4. MR-04

    Studies and reports

    Coastal studies, breakwater engineering reports and hydrographic, geotechnical and environmental studies often come first and shape the design. For two Arctic harbours, we translated over 400 pages of marine, geotechnical and environmental studies. Our geotechnical translation covers the borehole logs.

  5. MR-05

    Environmental protection

    Work windows for fish, in-water work limits and spill plans are written for the people on the barge. Their French has to be short and unambiguous.

  6. MR-06

    Movable bridges and marine lighting

    On a road swing bridge, we translated 101 electrical sheets, including the hydraulic bridge controls and the marine navigation lights. See the electrical translation page.

  7. MR-07

    Small craft harbour packages

    Wharf and breakwater rebuilds, floating wharves, launching ramps, basin dredging, wharf removal and seabed restoration. Each kind has its own sections, and we have translated packages of each. See small craft harbour projects.

  8. MR-08

    Tender documents and addenda

    When an addendum changes a depth or a detail, the French has to change with it. A translation memory shows exactly which text is new, so translators work on what changed and the approved terms stay where they are.

04 / Sheet MR-101: the terms

The words that cause trouble

Fourteen terms for marine structures and port infrastructure: wharves, breakwaters, dredging and piles. Approved once, used on every sheet, section and report after.

  • rubble mound breakwaterbrise-lames en enrochements35 31 23.13

    The NMS section title, and a structure small craft harbour packages often rebuild. Its layers are named one by one, so the breakwater has to keep one name from the first page to the last.

  • armour stoneroche de la carapace31 37 00

    The outer layer of a breakwater, in large graded stone. On the ferry terminal tender the source said "surge stone", the translator asked, and the French used pierre de carapace. The NMS term base gives roche de la carapace: the owner's choice decides which one a package uses.

  • riprapperré31 37 00

    Placed stone on a slope or a bank. Close to armour stone in the English, a different item in the French and in the price.

  • revetmentouvrage de protection35 31 19

    Shoreline or channel bank protection in graded stone layers. The NMS French title is broader than the English, so the term base fixes which one a package means.

  • dredgingdragage35 24 00

    Marine work with its own limits, disposal sites and environmental terms, which a bidder reads closely. See the dredging and breakwater sections of small craft harbours.

  • chart datumzéro des cartes35 24 00

    The reference every sounding and dredge depth is measured from. A wrong word moves a depth, and the dredged volume is paid by the cubic metre.

  • rubber marine fenderdéfense d'accostage en caoutchouc35 59 13.19

    A défense d'accostage on a wharf. A product suppliers quote against, so it has to be recognizable at once.

  • mooring devicedispositif d'amarrage35 59 29

    Specified in one NMS section, Mooring Devices. The French title is plural too: dispositifs d'amarrage.

  • pontoonflotteur35 51 23

    The NMS French is flotteur, not ponton, the everyday word. A floating wharf package uses it throughout.

  • concrete caissoncaisson en béton31 63 26.16

    A section of its own, Concrete Caissons for Marine Construction, with its own NMS French title: caissons en béton pour travaux maritimes.

  • cope wallmur de couronnement31 63 26.16

    The concrete cap along the wharf face, cast on caissons or piles. The specification places it with the bollard piers, so it appears on the structural sheets as well as in the sections.

  • sheet steel pilepalplanche d'acier31 62 16.13

    A palplanche, which is not a pieu. Sheet piling forms a wall; a pile carries a load. The two sit in neighbouring sections.

  • cathodic protectionprotection cathodique26 42 00

    For docks, harbours and piles under water. An electrical section on a marine job, so two authors write about the same steel.

  • finger dockappontementMR-101

    A specific marine structure, and a general word for "dock" loses what is being built.

Whose word wins

The owner's standard comes first

Marine owners usually have approved French. Their list comes first, then your firm's, then the NMS. We record each choice in the term base and use it everywhere in the contract. The NMS terms on this page come from our NMS memory and term base, and more are in our construction glossary.

05 / One term base, every document

The owner's terms first, then your firm's, then the NMS.

Technitrad's NMS term base holds over 15,000 terms. The term base built from your documents is yours, whether you stay with us or not.

AIdentify

On a new project, the key terms are identified and translated first.

BValidate

A subject matter expert validates them, usually someone at your firm or at the owner.

C → DKeep, then check

They go into the term base before translation begins, and a final QA check tests the finished text against them.

Drawings

Drawings come back as drawings.

When a translator returns drawing text as a table, someone on your team has to retype it into CAD, label by label, in a language they may not read.

In the fileWritten back into the DWG

The text is extracted from the DWG, translated with the same term base as the specification and written back into the drawing. We have translated over 4,000 AutoCAD drawings. See how our drawing translation works.

On the sheetFrench runs longer

Text blocks are adjusted on the sheet, and some manual layout work may still be needed, particularly in tight schedule cells.

Other formatsQuoted separately

Scanned sheets and PDF-only sets are quoted separately, and we'll tell you what's possible before you commit.

06 / Who does the workOTTIAQ

Technical translators with experience in specifications and drawings, many of them certified members of Québec's order of translators.

Quality controlMQM

A linguist reviews the whole job with an AI-powered check built on MQM, the industry framework for translation errors, and decides every finding. No job leaves with an open critical or major error, and your own experts validate the key terms.

CertifiedISO 17100
ISO 18587
CAN/CGSB-131.10

One of a handful of Canadian companies certified on all three. Over 10 million words of NMS text translated.

07

NMS sections it touches

Standard NMS text in these sections comes back in the official French, which lowers the cost and shortens the turnaround. Your edits are translated in the same terms. See every division and section title in both languages. Federal projects and Québec public contracts can each require French, under different rules and at different stages. See our guides to official languages on federal projects and Bill 96 and construction documents.

15 sections, 2026-04 NMS
Division 01General RequirementsExigences générales1 section
  1. 01 50 13Temporary Facilities and Controls for DredgingInstallations et contrôles temporaires en matière de dragage
Division 26ElectricalÉlectricité1 section
  1. 26 42 00Cathodic ProtectionProtection cathodique
Division 31EarthworkTerrassements6 sections
  1. 31 37 00Rip-RapPerrés
  2. 31 53 13Timber CribworkCaissons à claire-voie, en bois
  3. 31 62 16.13Sheet Steel PilesPalplanches d'acier
  4. 31 62 16.14Steel Sheet Pile CellsOuvrages cellulaires en palplanches d'acier
  5. 31 62 16.19Tubular Steel PilesPieux tubulaires en acier
  6. 31 63 26.16Concrete Caissons for Marine ConstructionCaissons en béton pour travaux maritimes
Division 35Waterway and Marine ConstructionVoies d'eau et ouvrages maritimes7 sections
  1. 35 01 40.51Waterway Maintenance DredgingDragage d'entretien de voie navigable
  2. 35 24 00DredgingDragage
  3. 35 31 19RevetmentsOuvrages de protection
  4. 35 31 23.13Rubble Mound BreakwatersBrise-lames en enrochements
  5. 35 51 23PontoonsFlotteurs
  6. 35 59 13.19Rubber Marine FendersDéfenses d'accostage en caoutchouc
  7. 35 59 29Mooring DevicesDispositifs d'amarrage
01

Send your past translations

And your approved terms. We build your term base from them.

02

Choose per project

An AI draft your team reviews in NEOLO for routine documents, or review by our specialists when the stakes are high.

03

Ready to issue

On either route, AutoCAD DWG drawings come back with the translation written in place, so no one retypes a callout.

We were extremely satisfied with the service received from Technitrad delivering the [breakwater] translation.

Project manager / Federal fisheries department
Proof

Six of the world's ten largest engineering firms.

Are Technitrad clients. For the studies of two Arctic harbours, we translated over 400 pages of marine, geotechnical and environmental studies into French and localized 39 images and drawings. Read the Nunavut harbours case study. Federal packages include a wharf construction package of 67,931 words and a breakwater reconstruction package of 35 documents and 42,995 words, delivered in 26 days. See how we answer a tender's RFP questions.

Questions

Asked by marine and port teams.

What is a breakwater in French?

In the NMS French, a rubble mound breakwater is a brise-lames en enrochements, and its armour stone is roche de la carapace. Riprap on a slope is a perré, a different item.

Do you translate dredging specifications?

Yes. Dredging sections are translated in the NMS French. A grade depth is a profondeur à draguer below the zéro des cartes, chart datum, and the disposal and monitoring requirements use the same terms throughout.

Do you translate harbour studies?

Yes. For two Arctic harbours, we translated over 400 pages of marine, geotechnical and environmental studies and localized 39 images and drawings.

Do you work with the owner's terminology?

Yes. When a department or a port authority has its own standard terms, they go into the term base before translation and take precedence over the NMS.

Can the drawings stay bilingual on one sheet?

Yes. On AutoCAD DWG files, we can keep English and French together on the sheet. It takes more layout work, because the sheet has to hold about twice the text.