The Canadian sense
The whole set: every document the owner and the contractor sign up to.
In Canada, the construction documents are the contract documents: the agreement and its conditions, the specification organized by the National Master Specification's divisions, the drawings and the addenda. Which of them must exist in English and French depends on the owner: a federal solicitation sets it, a Quebec public body requires French.

In Canadian practice, construction documents are the contract documents of a project: everything the owner and the contractor sign up to. The Canadian Construction Documents Committee (CCDC), a national committee formed in 1974 of owners, contractors, architects, engineers and specification writers, with a construction lawyer, publishes Canada’s standard construction documents, including its contract forms. Its stipulated price contract, CCDC 2, names the contract documents in its agreement: the agreement itself, the definitions and the general conditions, then the specifications, drawings and other documents the parties list.
The Canadian sense
The whole set: every document the owner and the contractor sign up to.
The narrower American sense
A design phase: when the drawings and specifications are completed for tender.
The term also has a narrower, mostly American sense: the construction documents phase of design, when the drawings and specifications are completed for tender. This post uses the Canadian sense, the whole set.
Eight kinds, from the contract to the addenda. The specification is organized by MasterFormat divisions, the numbering of the National Master Specification, which is published in both English and French by the National Research Council.
The set, front to back
After the award: shop drawings, submittals, O&M manuals, record drawings
After the award, the set keeps growing: shop drawings, submittals, operation and maintenance manuals and record drawings follow from it. They are where the set’s terms travel furthest, as our post on shop drawings in French shows.
The contract sets the order.
The contract decides. CCDC 2 sets an order of priority among the contract documents for when they conflict, in its general conditions; other forms set their own. Check the order in your own contract before relying on any summary, and ask counsel for your case.
The order matters in two languages too. Which version prevails when the English and French disagree is for the contract to say; in a Quebec public contract, the French prevails unless the parties set the legal value of each (Regulation respecting the language of the civil administration, s. 14).
At the front of the specification. Division 00, Procurement and Contracting Requirements, holds the documents that frame the contract: the seals page, the table of contents, the list of drawing sheets and the instructions to bidders. Division 01, General Requirements, sets how the work is run for every trade: submittals, quality control, temporary facilities and closeout.
00
Seals page, table of contents, list of drawing sheets, instructions to bidders.
01
Submittals, quality control, temporary facilities, closeout: how the work runs for every trade.
Both divisions exist in the official English and French of the National Master Specification. Our guide to the NMS divisions in English and French gives every division and section title in both languages.
It depends on the owner. What follows sets out what the texts say; it is not legal advice.
Whose set
Three sets we translated show the range:
122,000
words · 99 sections · 25 drawings · 118 questions
72
drawing sheets · then the specification, then its addenda
NMS
sections · general requirements to dewatering
Two of these sets arrived in parts and over time. That is the point to plan for: the drawings, the specification and the addenda must name each thing the same way even when they reach the translator months apart.
Where the two versions meet
Where the documents meet. A part named one way on a drawing and another in its specification section; an addendum translated without the original package’s terms; a schedule on a drawing that no longer matches the section it lists. Each is a small difference in one language that becomes a contradiction across two.
The fix is to translate the set as one set: settle the terms first, in a term base, then translate the drawings and the specification in parallel from those terms, and the addenda in the same term base. See how we work across a whole set in our engineering translation services.
The specification needs its own preparation. Our posts explain what the National Master Specification is, how it maps to MasterFormat, and what a specification writer can settle before translation; our National Master Specification translation service covers the rest.
Send your package: specs, drawings or reports. We reply with a price and a date.