As-built drawings in French: four sources, four answers, and how to choose.
As-built drawings record a building or structure as it was actually built. Their French name depends on the source: the OIQ advises plan final or relevé and says to avoid tel que construit, the OAQ proposes three precise terms, the GDT lists both conforme à l'exécution and tel que construit, and the federal specification's French says dessins d'après exécution.


What are as-built drawings?
As-built drawings show a building or structure as it was actually built, with the changes made during construction. They are the reference for operation, maintenance and future renovations, and they can be part of the closeout package. In English the names overlap: as-built drawings, as-builts, record drawings and as-built surveys are used for documents that are not quite the same thing.
What are as-built drawings called in French?
There is no single answer, and the professional orders depart from common usage. Plans tels que construits is the common phrase, and the OIQ, the engineers’ order, says to avoid it. Here is what each source says:
- Ordre des ingénieurs du Québec (OIQ)plan final, or relevéTel que construit is confusing and should be avoided; a plan final must be signed and sealed, a relevé need not be
- Ordre des architectes du Québec (OAQ), 2020dessins finaux, dessins conformes à l'exécution, relevé finalTel que construit implies drawings that match the work in every respect; write more precise terms into the contract
- Grand dictionnaire terminologique (OQLF), 1994conforme à l'exécution, tel que construitA notation on drawings and documents attesting that they reflect any changes made up to completion
- Our National Master Specification term basedessins d'après exécutionThe French of As-Built drawings in federal specifications
The Ordre des ingénieurs du Québec is the most direct: “le terme « tel que construit » (TQC), utilisé pour qualifier des contextes différents, porte à confusion et il est donc à proscrire”, and it recommends plan final or relevé depending on the case. Translate as-built drawings as plan final and the French announces an engineering document that must be signed and sealed. A relevé need not be sealed, and an engineer may or may not prepare and sign it.
The Ordre des architectes du Québec comes at it from the contract: tel que construit suggests drawings that match the work in every respect, and, the OAQ notes, even with close site supervision the architect may not know of every change made during construction, so it recommends writing more precise terms into the contract. The Grand dictionnaire terminologique still lists conforme à l’exécution and tel que construit as preferred terms, in an entry last updated in 1994.
As-built, record drawings or survey: which one is in your contract?
The French terms force a choice that the English often leaves open. The OAQ distinguishes three documents:
- dessins finauxPost-construction drawings that include every change document of the construction contractClosest English termrecord drawings
- dessins conformes à l'exécutionThe same, plus the contractor's annotations of changes made on siteClosest English termas-built drawings
- relevé finalDrawings made from measurements taken on site after the workClosest English termas-built survey
Before translating, find out which one the contract asks for. If the contract says “as-built drawings” and the architect will produce drawings from the change documents without the contractor’s site notes, the OAQ’s term for that document is dessins finaux, not dessins conformes à l’exécution; confirm it with the architect before the set is translated. On a federal project, the specification’s French decides: our National Master Specification term base gives dessins d’après exécution for As-Built drawings and dessins à verser au dossier du projet for project record drawings. So on a federal project, record drawings is not a synonym for dessins finaux.
What goes on the title block
The OAQ recommends a note on the title blocks of post-construction drawings that states their scope, so the next person who uses them knows what they show. The OIQ suggests a similar note on a plan final, stating that it reflects the original design and the engineer’s changes during construction. A relevé final, the OAQ adds, should state that it matches the building on the date of the survey. Translate each note with the same term the contract and the specification use, and keep it identical on every sheet of the set.
How we translate post-construction drawings
We translate the text in the DWG and write the French back into the drawing, so nothing is retyped. One glossary is enforced across the drawings, the specification and the reports, which keeps the contract’s term on every title block. We have translated over 4,000 AutoCAD drawings. Send the drawing set and we reply with a quote within one business day.
Already have the French set? Our free terminology check takes DWG drawings and reports every inconsistent term, in confidence. Our post on what to send for drawing translation lists the files; O&M manuals and closeout documents in French covers the rest of the handover. More on the service: drawing translation.
For the drawings themselves, see how to translate text in AutoCAD, bilingual drawings, shop drawings in French, and how to change the language in AutoCAD.
Common questions
What is “as-built drawings” in French?
Is “plans tels que construits” correct?
What is the difference between as-built and record drawings?
What is an as-built survey?
Do as-built drawings have to be sealed?
Your engineers review the translation in the terms they approved.
Send your package: specs, drawings or reports. We reply with a price and a date.
FreeFree terminology checkUpload a recent translated deliverable. We return a short report of every inconsistent term.